0086-510-85187837 24/7 Helpline

Realization of coal function

author:EBICO 2019-10-24

System composition(system configuration)VLDBoiler Burner

  1. Pulverized coal unpacking,storage and feeding measuring systemVLDBoiler Burner

  Pulverized coal ton bag bale breaker: unpacking amount: 15 bags/h, kufting hoist: 2t, power: 4.3KW, independent and automatic dust removal system, independent control system.VLDBoiler Burner

  Pulverized coal temporary storage bin: capacity: 2m3, upper and lower material level indicator alarm, anti-caking and arch-breaking device, outlet safety valve.VLDBoiler Burner

  Pulverized coal measuring and feeding device: max. coal supply amount: 4500kg/h, max. air supply amount: 8000m3/h, air pressure: 7000Pa, the wear-resistant pipeline from fan to burner.VLDBoiler Burner

  2. Combustion systemVLDBoiler Burner

  Combustion main engine: max. heat supply amount: 24750KW, max.coal amount: 4500kg/h, blower power: 55KW.VLDBoiler Burner

  3. Automatic control systemVLDBoiler Burner

  A set of operation platform, a set of automatic control, automatic ignition, intelligent electronic proportional control, electronic intelligent pressure and abstract simulation frequency control.VLDBoiler Burner