0086-510-85187837 24/7 Helpline

Burner installation (1)

author:Martin 2019-10-22

  Before installing burner in boiler, installation plate and burner brick must be prepared according to the national size.DocBoiler Burner

  On the one hand, the mounting plate can meet the requirement of supporting the weight of the burner, on the other hand, it can also connect the burner and the boiler.When installing, fix the burner connecting mounting plate to the boiler equipment.DocBoiler Burner

  The size of the crater brick includes the length and diameter of the crater brick.In general, in order to facilitate the burner head into the boiler, the actual diameter of the burner brick is 20~25mm larger than that of the burner head.The actual length of firehole brick is designed according to the technical requirements of boiler structure and burner.DocBoiler Burner

  The gap between the boiler throat and burner head after installation should be filled with aluminum silicate blanket to ensure thermal insulation.DocBoiler Burner

  Asbestos rope must be installed in the interface of burner and front furnace wallboard to ensure no smoke leakage.DocBoiler Burner
DocBoiler Burner
 DocBoiler Burner

NEXT  Fan installationDocBoiler Burner

 DocBoiler Burner