Before installing burner in boiler, installation plate and burner brick must be prepared according to the national size.
On the one hand, the mounting plate can meet the requirement of supporting the weight of the burner, on the other hand, it can also connect the burner and the boiler.When installing, fix the burner connecting mounting plate to the boiler equipment.
The size of the crater brick includes the length and diameter of the crater brick.In general, in order to facilitate the burner head into the boiler, the actual diameter of the burner brick is 20~25mm larger than that of the burner head.The actual length of firehole brick is designed according to the technical requirements of boiler structure and burner.
The gap between the boiler throat and burner head after installation should be filled with aluminum silicate blanket to ensure thermal insulation.